Changing contractors with open defects: a handover checklist

When another contractor takes over unfinished aftercare work, each open case has to move with its history intact. Here is what a residential care team should pass on, keep back and tell the homeowner.

Short answer

Before a new contractor takes over an open defect, give them a transfer record for that case: the current condition, the work already done, the agreed scope, the evidence, what is still unknown and the next action. Name the person responsible for that action and record whether the incoming contractor has accepted it. This guide assumes the change has already been decided through your commercial process. It does not cover termination, payment or warranty liability.

Establish the current position before transferring work

Before sending anything, find out where each open case stands. Start from your defect register, list the cases still assigned to the outgoing contractor and check each one:

  • Is the case still open, and what is its next action?
  • What work was carried out, and is there a record or photo of it?
  • Did your team review that work, and what did it decide?
  • Is any part of the scope disputed or still awaiting agreement?
  • What information is missing, such as materials ordered or tests already done?

Record the position at transfer with the date and the name of the person who compiled it. Mark where each statement comes from: checked by your team, reported by the outgoing contractor or observed by the homeowner.

“Unknown” is a useful answer. If nobody knows whether parts were ordered or what an earlier visit found, record it as unknown and turn it into a question rather than a guess.

Assemble the open-case transfer record

Prepare one transfer record per open case, with a covering list if several cases move at once. Reuse the register’s case reference: the register stays the parent record.

What the incoming contractor needs

Fields in an open-case transfer record
SectionWhat to include
IdentityCase and location, outgoing and incoming contractor, care-team contact, transfer date.
Current conditionOriginal observation, latest reported condition, previous assessment and its author, date checked.
Work historyAgreed work, earlier visits, evidence references, review decisions, outstanding items.
Transfer scopeWork or assessment now requested, scope awaiting agreement, required documents, materials status if known.
ArrangementsRelevant access needs, any agreed appointment, people to notify.
ResponsibilityPerson responsible for the next action, the incoming contractor’s response, open questions, next update date.
Sharing recordDocuments shared, recipients and dates, internal material kept separately.

What stays with the care team

  • Commercial discussion about the change, including prices and disputes.
  • Personal information the work does not need.
  • Internal notes and records about other homes or other contractors.
  • Speculation about why earlier work did not finish. If the reason matters, record it in one neutral sentence.

Confirm responsibility for the next action

Assigning a case does not mean the new contractor has taken it on. Record each step separately, so everyone can see whether the brief awaits a reply or a visit is arranged.

Four steps that are easy to merge by mistake
StepWhat it meansWhat to record
AssignedYour team names the incoming contractor as responsible for the next action.Date and the person who assigned it.
Brief receivedThe contractor has the transfer record and the documents it lists.Date sent, recipient and confirmation of receipt.
AcceptedThe contractor agrees to take the next action. A reply with questions is not yet acceptance.Date, the response and any questions raised.
Visit agreedA date and access are arranged with the homeowner.The appointment and who will attend.

Until the contractor accepts the next action, your team remains responsible for follow-up. List each open question with the person who will answer it and a date. The aftercare process guide describes the normal assignment step; a contractor change repeats it with more history attached.

Whole-building handovers raise the same issue: RIBA’s Plan for Use Guide asks teams to check that responsibilities were properly handed over, and notes that clients often fail to separate operation, defects, routine maintenance and aftercare.

Work through a fictional contractor change

This cupboard repair has an incomplete visit record, so the incoming contractor assesses before anyone agrees a repair.

Fictional example

Hall cupboard repair passed to a new contractor

EX-H01

Example development · Example home 18 · Hall cupboard

Earlier history

  1. 12 SepOwner reports that the hall cupboard door has dropped and no longer closes.
  2. 16 SepCare team assigns the case to Contractor A to inspect and adjust.
  3. 30 SepContractor A records a visit: hinges adjusted, further work may be needed. No completion photo and no note of what remains.

Position at transfer

  1. 20 OctThe commercial process confirms that Contractor B will take over Contractor A’s open cases.
  2. 21 OctOwner sends two current photos: the door still catches at the top.
  3. 21 OctCare coordinator compiles the transfer record. Unknown: whether replacement hinges were ordered and what Contractor A found in the frame.

Next action

  1. 22 OctCase assigned to Contractor B to assess the current condition. Transfer record and photos sent.
  2. 23 OctContractor B accepts the assessment and asks for the cupboard’s fitting specification.
  3. 24 OctAssessment visit agreed with the owner for 29 October, morning.

Fictional example. The home, dates and contractors illustrate the process. No repair outcome is shown because the assessment has not yet taken place.

The record does not suggest that Contractor A acted improperly or that Contractor B accepts the earlier work. The two unknowns stay open for the assessment. The second row below shows a case briefed but not yet accepted.

Open-case transfer record

One row per open case, with the reference from your defect register. Use it in a spreadsheet or copy the fields into your existing system, and send the incoming contractor only their rows. The fictional rows show one case accepted and one awaiting a reply.

Case referenceHome and locationOutgoing / incoming contractorCare-team contactTransfer dateOriginal observationLatest condition (source, date)Previous work (recorded by)Evidence and review decisionsWork now requestedUnknowns and open questionsAccess and appointmentNext action (responsible)Incoming contractor’s responseNext update to homeownerShared (what, with whom, when) and access review
EX-H01Example home 18 · Hall cupboardContractor A / Contractor BCare coordinator21 Oct 2026Cupboard door has dropped and does not close (owner, 12 Sep)Door still catches at the top (owner photos, 21 Oct)Hinges adjusted, further work may be needed (Contractor A, visit 30 Sep)Visit note only; no completion photo; no review decisionAssess the current condition and propose a repair; repair scope not yet agreedWere replacement hinges ordered? What did Contractor A find in the frame?Owner provides access; visit agreed 29 Oct, morningContractor B to assess; care coordinator to review the proposalAccepted the assessment 23 Oct; asked for the fitting specification31 OctReport, visit note and photos to Contractor B, 22 Oct; internal notes kept separately; Contractor A’s access reviewed 22 Oct
EX-H02Example home 22 · BathroomContractor A / Contractor BCare coordinator21 Oct 2026Gap in the sealant around the shower tray (owner, 3 Oct)Not rechecked since 3 OctNone; no visit yetOwner photos onlyAssess and reseal if the tray is soundDoes the tray move? Unknown until assessedVisit not yet agreedCare coordinator to follow up with Contractor B on acceptance and a visit dateBrief sent 22 Oct; no reply yet28 OctReport and photos to Contractor B, 22 Oct; Contractor A’s access reviewed 22 Oct

Scroll sideways to see every column.

Download the record (CSV)Opens in Excel, Numbers or Google Sheets. The example rows are fictional; delete them before use.

Mark where each statement comes from: your team, the outgoing contractor or the homeowner. Write “Unknown” rather than guessing, and add the question it raises.

Tell the homeowner what changes

The homeowner should hear about the change from your team and not have to explain the defect again. Tell them:

  • Their contact stays with your care team.
  • Who will do the next step, once the incoming contractor has confirmed.
  • What that step is: an assessment, a repair or a request for information.
  • The visit date, only if it has been agreed.
  • When they will next hear from you.
Example message to the homeowner

Hello, Contractor B will now handle the work on your hall cupboard door. We have passed on your report, the September visit record and your photos of 21 October, so you will not need to explain it again. Contractor B will first assess the door; the visit is agreed for 29 October, morning. Your contact remains our care team, and we will update you by 31 October.

Leave the commercial reason out. If the next step is uncertain, see what to tell a homeowner when the repair date is unknown.

Review access and retain the history

Share only what the incoming contractor needs, and keep the full history with your team.

  • Send only their cases and the documents each one needs.
  • Save an extract as a separate file. A filtered view of the full register still contains its other rows.
  • Review the outgoing contractor’s access to shared folders or portals when the assignment changes, keeping only what any remaining obligations need.
  • Keep earlier visits, reports and review decisions in the parent record; do not overwrite them.
  • Note in the sharing record what was sent, to whom and when.

Changing the contractor does not close the case or settle what happened to the earlier work. When Contractor B reports the work done, your team reviews it against the transfer record, using the completion evidence checklist. If you use aftercare software, check that reassignment keeps earlier entries visible.

Where this applies

For care teams at residential developers, in any market, once the decision to change contractor has been made. The record is an operating aid, not a legal standard. Whether a change affects warranty responsibility, payment or the previous contract depends on your agreements and local rules: check them with your adviser. Some warranty schemes have their own route for unresolved items. In Ontario, for example, Tarion’s conciliation process can in rare cases arrange for a third party to carry out repairs. Follow the procedure that applies to you.

About the author · Toveta

Has built software for property developers since 2016, from CRM systems to listing portals.

Sources

  1. RIBA. RIBA Plan for Use Guide. UK, 2021; Stage 6 whole-building handover guidance, not a procedure for changing an aftercare contractor
  2. Tarion. Conciliation process, assessment & resolution. Ontario; process context only, checked 3 November 2026

Spotted an error or an outdated source? Email info@wisemonks.com and we will correct the page.

Frequently asked questions

Does changing the assigned contractor close the original case?

No. The case stays open until your team reviews the actual outcome and decides to close it. The change alters who does the next piece of work, not what has happened to the defect.

What if the previous contractor’s records are incomplete?

Keep whatever is available, note what is missing and ask for it through the appropriate contact. Where the gaps matter, brief the incoming contractor to assess the current condition before a repair is agreed.

Should the incoming contractor receive the whole project register?

Usually not. Send an extract with only the cases and documents their assignment needs. A filtered spreadsheet still contains the other rows, so save the extract as a separate file.

Does the contractor change alter warranty responsibility?

This checklist does not decide that. Responsibility for warranty work, payment and earlier repairs depends on your agreements and the rules that apply where the home is, so check them with your adviser.

Choose what Toveta may use on this device. You can come back and change this at any time. The cookie policy lists each cookie.

NecessaryLoads the site securely and remembers this choice.
Always on
AnalyticsGoogle Analytics 4. Shows us how the site is used.
AdvertisingLinkedIn Insight Tag. Measures our LinkedIn campaigns.